Ionic Digital Inc. (IOND) Stock Price & How to Invest
Last updated November 2026
Short answer
IOND is Ionic Digital Inc., the Nasdaq-listed successor to Celsius Network's bitcoin mining business, now converting its Texas power sites into leased AI and high-performance computing data centers. Shares began trading via direct listing on July 28, 2026 at a ~$50 reference price, closed at about ~$63 on October 16, 2026 (roughly where the first session ended, but down ~26% over the past month after peaking near ~$89), for a market cap near ~$2.8 billion, and can be bought like any other ordinary US-listed stock through a standard brokerage account.
IOND stock price
As of 2026-11-16, Ionic Digital Inc. (IOND) last closed at $62.05, down 1.2% over the past month. Over its trading history so far it has traded between $54.75 and $86.64.
Prices are daily closing prices from Yahoo Finance and may be delayed. For the live quote, check your broker or Ionic Digital Inc.'s investor relations page. Walnut is informational, not investment advice.
IOND key stats
At $62.05 on November 16, 2026, Ionic Digital Inc. (IOND) has a market cap of $2.8B.
- Market cap
- $2.8B
- P/E (forward)
- 37.8
- Price to book
- 3.2
Market cap, P/E and yield are measured at the $62.05 price on November 16, 2026, from Yahoo Finance figures pulled in November 2026. Earnings date from Yahoo Finance. Walnut is informational, not investment advice.
What's new with Ionic Digital Inc. (IOND)?
The last two weeks for Ionic Digital Inc., as of November 17, 2026: the price move, the next earnings date, what the company filed with the SEC, and what analysts changed.
- IOND closed at $62.05 on November 16, 2026, down 3.0% over the past five trading days (from $64.00).
- On November 12, 2026, Ionic Digital Inc. filed its quarterly report (10-Q) with the SEC. Read the 10-Q on sec.gov
- On November 4, 2026, Ionic Digital Inc. filed an 8-K with the SEC reporting quarterly results (Item 2.02). Read the 8-K on sec.gov
Prices are daily closes from Yahoo Finance. Filings are read from SEC EDGAR every six hours. Analyst actions come from Yahoo Finance as of November 2026. Walnut is informational, not investment advice.
What does Ionic Digital Inc. (IOND) do?
Ionic Digital Inc. was formed in January 2024 to hold the mining assets of Celsius Network, which filed for Chapter 11 in July 2022. Those assets included mining hardware, power contracts, real estate and roughly ~540 bitcoin, and the equity went to former Celsius creditors as part of the bankruptcy plan. Since then the company has pivoted hard: rather than run its own machines against a falling hashprice, it leases energized capacity at its Ward County, Texas campus to an AI cloud operator. The centerpiece is a triple-net lease with Nscale, described at listing as roughly ~323 MW of contracted capacity across about a decade and roughly ~$2.6 billion of contracted revenue, under which the tenant carries rent plus operating costs including taxes, insurance and maintenance. In its second-quarter 2026 report the company counted 234 MW of contracted operating capacity at Ward County, with cash lease payments beginning in August. Legacy self-mining continues at roughly ~12.2 EH/s, a fraction of what larger operators run, and its contribution is shrinking fast by design.
For investors the picture is a landlord business wearing a miner's history. The first quarter as a public company (Q2 2026, reported August 19-20) showed revenue of ~$48.6 million, up 31% from a year earlier, with leasing at ~$43.8 million or 90% of sales, and adjusted EBITDA of ~$37.6 million. Management reaffirmed 2026 guidance of ~$190 million to ~$195 million in revenue and ~$137.5 million to ~$142.5 million of adjusted EBITDA, an unusually high margin that reflects how little cost sits with the landlord under a triple-net structure. GAAP results look nothing like that: Q2 posted a ~$35.3 million net loss, driven by a ~$28.2 million non-cash bitcoin fair-value loss and a ~$27.2 million tax provision, and the trailing twelve months show a net loss near ~$300 million. A ~$400 million preferred-stock-and-warrant private placement in June left ~$415.7 million of cash, no borrowings, and 2,882 bitcoin worth ~$168.7 million at quarter end. In September ERCOT granted a provisional Base Load classification for the remaining 466 MW at Ward County, which would take the campus to 700 MW, targeted by the end of 2027. At roughly ~$2.8 billion of market value the stock prices in that build-out rather than the current income statement, and the next report is scheduled for November 4, 2026.
What's driving Ionic Digital Inc. (IOND)?
1. The Nscale triple-net lease
The Ward County campus sits under a triple-net lease with AI cloud operator Nscale, described at listing as roughly ~323 MW and approximately ~$2.6 billion of contracted revenue over about a decade; the Q2 2026 report counted 234 MW of contracted operating capacity, with cash payments starting in August. Because the tenant pays operating expenses, taxes, insurance and maintenance, incremental rent converts to EBITDA at a far higher rate than self-mining ever did. Leasing produced 90% of Q2 revenue, in line with guidance of ~90% to ~92% for full-year 2026.
2. Energizing the remaining power pipeline
In September 2026 ERCOT gave Ionic Digital a provisional Base Load classification in its Batch Zero process for the remaining 466 MW energization request at Ward County, which would bring the campus to 700 MW. The classification is still subject to ERCOT verification and final determination, and the company targets that final tranche by the end of 2027, contingent also on two utility infrastructure projects. Separately it is pursuing conversion of 112 MW at Midland to AI workloads. Capital expenditure guidance of ~$45 million to ~$60 million for 2026 excludes any new site acquisitions.
3. Winding down capital-intensive self-mining
Bitcoin mining revenue fell roughly ~82% year over year in the first quarter of 2026 and was only ~$4.8 million in Q2 as machines gave way to leased racks. Shrinking the fleet removes exposure to hashprice compression, network difficulty and the post-halving squeeze that has pressured the whole mining sector. The company still holds 2,882 bitcoin, though, and its fair-value swings flow straight through GAAP earnings, as the ~$28.2 million Q2 mark showed.
4. A cleaned-up balance sheet and fresh equity
A ~$400 million private placement of Series A preferred stock and warrants closed in June 2026, leaving ~$415.7 million of cash, no borrowings, and ~$168.7 million of bitcoin at the end of June. Very low leverage gives the company room to fund build-outs with debt if data center financing markets stay open. Activist-leaning investor Sachem Head has since raised its position to the 9.99% cap through shares and warrants, and Jefferies started coverage in August at Buy with an $85 target. Whether the capital is deployed at attractive terms is the open question, since large-scale AI campuses are capital hungry.
What are the risks to Ionic Digital Inc. (IOND)?
Tenant concentration is the dominant risk: a single lease with Nscale accounts for the overwhelming majority of contracted revenue, so the tenant's own funding, credit standing and demand outlook effectively become Ionic Digital's. Execution risk follows close behind, because contracted megawatts only pay rent once they are actually energized and delivered, and the 466 MW expansion depends on a provisional ERCOT classification, utility projects and construction timelines in West Texas that routinely slip. GAAP losses remain large, with a trailing net loss near ~$300 million against adjusted EBITDA guidance of ~$137.5 million to ~$142.5 million, a spread that reflects impairments, digital-asset marks, tax provisions and non-cash charges that investors have to unpick. The ~$168.7 million bitcoin holding keeps reported earnings tied to crypto prices. The share register is unusual: equity was distributed to former Celsius creditors and the company went public through a direct listing rather than an underwritten IPO, so there is no traditional lockup and the trading history is under three months long; the stock has ranged from $50 to about $89 and fell ~26% in the month to October 16, 2026. Preferred stock and warrants from the June financing add potential dilution. Governance history adds another layer, including a Delaware Chancery Court proxy dispute resolved in the company's favor in 2025.
What is the Ionic Digital Inc. (IOND) forecast?
3 analysts publish price targets on IOND, averaging $92.67 as of November 2026, or +49.3% against the $62.05 share price on November 16, 2026. The published targets run from $74.00 to $119.00, a moderate spread, and the ratings split 3 buy, 0 hold, 0 sell. Over the last six months there have been 0 raises and 0 cuts among the published actions. A price target is what an analyst published on a date, not a prediction, and sell-side ratings skew positive across the whole market.
Read the full IOND forecast and price target for the target table, the recent rating actions by firm, and how the consensus has shifted.
Is IOND a buy or a sell?
We give no verdict on Ionic Digital Inc.. Both cases are real, which is why the question is contested at all, so here is the strongest version of each.
The case for buying. The Nscale triple-net lease. The Ward County campus sits under a triple-net lease with AI cloud operator Nscale, described at listing as roughly ~323 MW and approximately ~$2.6 billion of contracted revenue over about a decade; the Q2 2026 report counted 234 MW of contracted operating capacity, with cash payments starting in August. The most optimistic published target, $119.00, assumes this works close to its best case.
The case against. Tenant concentration is the dominant risk: a single lease with Nscale accounts for the overwhelming majority of contracted revenue, so the tenant's own funding, credit standing and demand outlook effectively become Ionic Digital's. The most pessimistic target, $74.00, is roughly what IOND is worth if this bites instead.
Read the full bull and bear case on IOND, including what would have to change to break either one. Walnut is not an investment adviser.
Has Ionic Digital Inc. (IOND) split its stock?
No. Ionic Digital Inc. (IOND) has not split its stock in the last 10 years. The statement covers only the window we check, so an older split in the company’s history is possible. It also matters less than it once did: fractional shares mean a high price per share no longer keeps smaller investors out, which removed most of the practical reason to split.
How is Ionic Digital Inc. (IOND) valued?
Market cap, P/E and dividend yield at today's price are in the IOND key stats above. The business figures below come from Ionic Digital Inc.'s reported results as of October 2026 and change when it next reports.
- Revenue (TTM): ~$163 million; Q2 2026 ~$48.6 million, up 31% year over year
- Leasing share of revenue: ~90% in Q2 2026 (~$43.8 million); 2026 guidance ~90% to ~92%
- Margins (TTM): Gross ~69%, operating ~43%; net margin deeply negative on crypto marks and tax
- Net income (TTM): ~-$300 million (EPS ~-$6.68); Q2 2026 net loss ~$35.3 million
- FY2026 guidance (reaffirmed): Revenue ~$190 million to ~$195 million; adjusted EBITDA ~$137.5 million to ~$142.5 million
- Cash, debt and bitcoin: ~$416 million cash, effectively no debt, 2,882 BTC (~$169 million) at June 30, 2026
As of October 2026: With no positive trailing earnings, the stock is generally framed on sales, EBITDA and forward estimates: roughly ~17 times trailing sales and about ~27 times the next-year EPS consensus, falling to about ~15 times sales on the midpoint of 2026 guidance. Those multiples sit well above legacy bitcoin miners and closer to data center and neocloud infrastructure names, consistent with a contracted backlog of roughly ~$2.6 billion and a path to 700 MW that dwarfs current revenue. For Q3, due November 4, 2026, consensus looks for ~$46.3 million in revenue and EPS of ~$0.62.
Who competes with Ionic Digital Inc. (IOND)?
Miners pivoting to AI and HPC hosting
Core Scientific, TeraWulf, Cipher Mining, IREN, Hut 8 and Applied Digital are all converting bitcoin mining power capacity into leased AI compute, and several have signed similar long-dated hosting or triple-net agreements; several also received ERCOT Batch Zero classifications alongside Ionic Digital in September 2026. They compete for the same scarce inputs: energized grid interconnects, land near cheap power, and creditworthy AI tenants willing to sign decade-long contracts.
Pure-play bitcoin miners
MARA Holdings, Riot Platforms and CleanSpark remain focused on self-mining at far larger scale, with MARA running roughly ~30 EH/s against Ionic Digital's ~12.2 EH/s. They are the relevant comparison for the legacy part of the business and a reminder of the economics Ionic Digital is stepping away from, since hashprice compression after the halving has squeezed self-mining margins across the group.
Data center landlords and neoclouds
Equinix, Digital Realty and private operators such as Vantage and Switch set the pricing and lease-structure benchmark for large-scale colocation, while CoreWeave, Nebius and Nscale itself represent the AI-native compute layer that rents the space. Ionic Digital sits on the landlord side of that split, which means its comparables on valuation are increasingly real-asset infrastructure companies rather than crypto equities.
What stocks are similar to Ionic Digital Inc. (IOND)?
Other names that sit close to IOND: same theme, named as a direct competitor, or held beside it in the same funds. Each entry says which. They are useful if you want to spread one thesis across several tickers.
How to invest in Ionic Digital Inc. (IOND)
There are three common ways to get IOND exposure. Buy shares (or fractional shares) directly at any major broker. Hold an ETF that includes it, which spreads the position across many companies. Or build it into a focused thematic portfolio, so IOND sits alongside other stocks that express the same thesis.
Walnut takes the portfolio route. Describe a thesis where IOND fits (for example “AI infrastructure” or “dividend-growth large-caps”) and the AI proposes 5 to 6 constituents with target weights. You review the plan and fund it through your own broker when you're ready.
New to this? Start with how to invest in stocks, see how to analyze a stock with AI, or compare the best AI stock analyzers.
The bottom line on Ionic Digital Inc. (IOND)
Ionic Digital is a former bitcoin miner whose value now rests mostly on one large triple-net AI data center campus in Ward County, Texas, which makes contract execution, energizing more megawatts and tenant quality the main story, with a ~$170 million bitcoin treasury still tying part of the balance sheet to the crypto cycle it came from.
More on Ionic Digital Inc. (IOND)
Whether IOND is worth buying today depends more on your time horizon and what you already hold than on any single call. We walk through valuation, what would have to go right, and the risks in is IOND a buy or a sell?, and where the stock could go from here in the IOND stock forecast.
For income investors, whether IOND pays a dividend and how the payout looks is covered in does IOND pay a dividend? And to weigh IOND against a peer, read the full side-by-side comparisons: IOND vs CORZ and IOND vs WULF.
Wondering how IOND fits the portfolio you already own? Walnut is an AI investing app that connects your brokerage read-only and answers questions like that about your actual holdings: overlap, concentration, and how each position tracks the S&P 500. Compare the best AI portfolio analyzers or see the best AI investing apps in 2026.
Your questions about Ionic Digital Inc.
Ask Walnut's AI anything about IOND and see how it fits what you own.
FAQ
What does Ionic Digital actually do?
+
Ionic Digital owns and develops power-dense data center capacity in Texas and leases it to AI and high-performance computing operators, while running a shrinking legacy bitcoin mining fleet of roughly ~12.2 EH/s. Its largest agreement is a triple-net lease with Nscale at the Ward County campus, where the company counted 234 MW of contracted operating capacity in Q2 2026 and is seeking to reach 700 MW by the end of 2027.
How is Ionic Digital connected to Celsius Network?
+
Celsius Network filed for Chapter 11 bankruptcy in July 2022, and Ionic Digital was formed in January 2024 to hold Celsius Mining's assets, including mining hardware, power contracts, real estate, roughly ~540 bitcoin and cash. Shares in the new company were distributed to former Celsius creditors under the reorganization plan.
When did IOND start trading on Nasdaq?
+
Trading began on July 28, 2026 through a direct listing rather than a traditional IPO, meaning no new shares were sold and no fresh capital was raised at the listing. The reference price was ~$50 and the stock closed its first session near ~$62.90, giving a fully diluted value around ~$2.75 billion. It has since traded between $50 and about $89 and closed near ~$63 on October 16, 2026.
Why is IOND unprofitable if adjusted EBITDA is so high?
+
The trailing twelve months carried a net loss near ~$300 million while 2026 adjusted EBITDA guidance runs ~$137.5 million to ~$142.5 million. In Q2 2026 alone, a ~$28.2 million non-cash bitcoin fair-value loss and a ~$27.2 million tax provision turned ~$37.6 million of adjusted EBITDA into a ~$35.3 million net loss. Impairments, digital-asset marks, depreciation and restructuring costs sit between the two figures.
How much of the revenue comes from one customer?
+
Digital infrastructure leasing was 90% of second-quarter 2026 revenue (~$43.8 million of ~$48.6 million) and is guided at ~90% to ~92% for full-year 2026, and the Nscale lease is the dominant contract within that. Concentration on that scale means the tenant's funding position and demand outlook matter as much to results as anything Ionic Digital controls directly.
Is IOND still exposed to the bitcoin price?
+
Yes, more through the balance sheet than operations. Mining revenue fell roughly ~82% year over year in the first quarter of 2026 and was ~$4.8 million in Q2, but the company held 2,882 bitcoin worth ~$168.7 million at June 30, 2026, and changes in its value run through GAAP earnings, as the ~$28.2 million Q2 loss on those holdings showed.
Does Ionic Digital pay a dividend?
+
No dividend is paid on the common stock. The company is loss-making on a GAAP basis and guides to capital expenditure of ~$45 million to ~$60 million in 2026 excluding new site acquisitions, plus a larger build-out toward 700 MW, so cash is directed toward building and energizing capacity rather than distributions.
How would someone add IOND to a thematic group of holdings?
+
IOND trades on Nasdaq as an ordinary US-listed stock, so it can be bought through any standard brokerage account and grouped with other names on a theme such as AI data center infrastructure or energy-to-compute conversion. In Walnut, a stated thesis is paired with constituents and target weights, and orders are placed at the user's own connected broker rather than by Walnut.
How did Ionic Digital do in its latest quarter?
+
Its first report as a public company covered Q2 2026: revenue of ~$48.6 million (up 31% from ~$37.2 million), adjusted EBITDA of ~$37.6 million (up from ~$3.8 million), and a GAAP net loss of ~$35.3 million on bitcoin marks and taxes. Full-year guidance was reaffirmed. The Q3 2026 report is scheduled for November 4, 2026, with consensus near ~$46.3 million in revenue and ~$0.62 of EPS.
How has IOND stock performed since listing?
+
As of October 16, 2026, IOND closed near ~$63, about 26% above its ~$50 reference price but essentially flat against its first-day close of ~$62.90. In between it reached about ~$89 before falling ~26% over the past month. Two analysts covering it have a mean target of ~$85. With under three months of trading history, price swings have been large.
Walnut is informational, not investment advice. Financial figures on this page are approximations; always verify current numbers with Ionic Digital Inc.'s investor relations page or your broker before making investment decisions.